The Orangeville Record

Committee of Adjustment

October 1, 2025

What was decided (5 motions)

5 carried, 0 recorded otherwise. Every motion below is printed as the minutes print it.

That the minutes of the following meeting be approved: 4.1 2025-08-06 Committee of Adjustment Meeting Minutes 1. Post-Meeting Minutes - CoA_Aug06_2025 - English.pdf
Moved by B. Wormington
Carried
That correspondence items 5.1.1 and 5.1.2 be received; That Planning Report – A-10/25 – 24 Faulkner Street be received; And that Minor Variance Application File No. A10-25 to: increase the maximum accessory building height to 6.1 metres, whereas the by-law permits the maximum accessory building height of 4.3 metres ; and increase the maximum accessory building coverage to 1 3 %, whereas the by-law permits the maximum accessory building coverage of 10% be approved.
Moved by R. Baldassara
Carried
Files: A-10/25
That Planning Report – B-04/25 – 1 Elizabeth Street and 32 First Street be received; And that Consent Application File No. B04-25 to create a parking easement over 1 Elizabeth Street in favour of 32 First Street be approved.
Moved by A. Harris
Carried
Files: B-04/25
That correspondence item 5.3.1 be received; That Planning Report – B-05/25 – 15 C Line be received; And that the following be removed from the list of conditions imposed on approved Consent Application B01-25 approved on June 4, 2025: That the owner demonstrates that the private septic system and associated piping and works associated with the retained lot be permanently disconnected, and the plumbing done in such a way that it cannot be reinstated. All work will be inspected by Infrastructure Services and be completed to the satisfaction of the Town.
Moved by B. Wormington
Carried
Files: B-05/25
That the meeting be adjourned at 6:26 p.m.
Moved by B. Wormington
Carried
Files: B-05/25

The town’s own record

Read the minutes this page was read from →

Where this page and that document disagree, the document is right and this record is wrong. Say so and it will be corrected.